Neuron Consult - Civil engineering consultancy


Hydro Scheme Alto Maipo, Chile

Download fact sheet

Project description

Halic metro bridge in IstanbulThe hydroelectric project of Alto Maipo is be located 60 km southeast of Santiago city and it involves the construction of two hydroelectric power plants, called Alfalfal II and Las Lajas, arranged in hydraulic series and producing 531 MW with water power coming form intakes over 70 km of tunnels and returning water to Rio Maipo canyon.


Services provided

  • detailed design for construction
  • construction follow-up
  • geological mapping

Period of work

09.2013 — 05.2015, 2017